Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13703885

- Product Categories
- Friendly Links
Information Name: | Direct screw hoist preferred ocean |
Published: | 2015-04-21 |
Validity: | 30 |
Specifications: | |
Quantity: | 100.00 |
Price Description: | |
Detailed Product Description: | New River County Water Machinery Plant ocean followed the trend, grasp the industry standard. I plant a strict quality system standards, strict implementation of ministerial DL / T5019-94 "hydropower project hoist manufacture, installation and acceptance", SD297-88 "QL-type screw hoist series of parameters", SD -298-88 "QL-type screw hoist standard", SD315-89 series of national standards, and has passed ISO9001 quality system certification. Now, I plant set casting, machining, metal structures, heat treatment, assembly, physical and chemical metering in one. I plant with strong technical force, well aware of technical innovation is the lifeblood of business, and it is fundamental to win market advantage, we have been depending on the product quality of life has improved detection methods and sound quality assurance system, so that every factory products meet industry standards. Over the years I plant with excellent product quality and reasonable prices, the country's water conservancy and hydropower construction projects in several successful bidder for the country's water conservancy construction has made outstanding contributions. Does not meet the pursuit of aggressive non-stop, endless struggle, constant development, which is most people's idea Yu, thinking and will. Yesterday is history, and today on the journey back yesterday, look to the future, today's Yu are being hydraulic market trend of the waves, sail. Adjustment screw hoist installation and commissioning: Hoist installation quality and life affect the results, please be sure to pay attention to the user. The overall quality of the project (eg: brake trough vertical, gate installation hanging position, etc.) have a direct impact on the quality of the installation, the user carefully before installing hoist to inspect the quality and ensure correct before connecting the hoist trial. Before the formal operation should note the following: First, remove surface dirt, dust, all add a little grease lubrication points; Second, ensure that the machine should be installed with the shutter concentricity error should not exceed 5mm; the three machines installed, first empty Two full-load operation to check for abnormalities; four, when the test first upgrade 100mm, check all parts for deformation, sliding gate in case the door slot, after confirmation only continue to improve, enhance 0.5m per check again. |
Admin>>>
You are the 6265 visitor
Copyright © GuangDong ICP No. 10089450, Hebei Ocean Water Machinery Plant All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 6265 visitor
Copyright © GuangDong ICP No. 10089450, Hebei Ocean Water Machinery Plant All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility